Document Controller SITE/ PROJECT MANAGEMENT
Posted by Arjun ThomasLocation: United Arab Emirates
Salary: Excellent TAX FREE salary
Company: Stepp Recruitment
Sector: Commercial
Job role: Project manager
Job type: Permanent
Date posted: 22/06/2009 18:50
Document ControllerSITE/ PROJECT MANAGEMENT
Ref: A1022
Location: Abu Dhabi UAE
Date Posted: 19 June 2009
Salary: Excellent TAX FREE salary
Details:
Stepp Recruitment Limited has been placing candidates to the Middle East for almost TWENTY YEARS!! No other recruitment Company has more experience in placing CURTAIN WALLING/ CLADDING/ FACADES skilled applicants to this prosperous and stunning region of the world.
We are delighted to be working with one of our most prestigious client Curtain Walling companies in the Middle East, a company which can offer its clients complete expertise in Architectural Aluminum and Glazing product’s design, manufacture and installation and having a coveted portfolio of some of the most outstanding and architecturally award winning projects throughout the region.
Document Controller – part of a vital team assisting the Project Manager in a role that is highly computer orientated. The successful person will have intelligence and common sense and be able to document any changes to projects by recording the information and liaison with various departments to ensure awareness and implementation of any amendments. This will require an ability to read and understand drawings.
Experience Required:
Be computer literate with at least 2 years (ideally 5) experience in curtain walling and be familiar with all the components – extrusions, glass, brackets, silicon screws, nuts, etc. Able to speak clear and fluent English, so more suitable to an English, American, South African or Australian nationality. Methodical, highly organised
This is a highly pressurised, challenging role that will suit someone who has worked in the Middle or Far East previously, understand the culture, climate and working conditions. MUST be a ‘doer’ who will give everything to the role. Someone who will roll up their sleeves and go out and push. Practical experience is more important that qualifications.
A mature person who has worked in the same environment and has an acceptance of stress levels. In return you will a superb TAX FREE salary plus accommodation, with the opportunity to work alongside some of the most experienced and techncially competent people in the Curtain Wall industry and be involved in award winning, internationally acclaimed projects throughout the world. This is a GLOBAL company and prospects are superb for ambitious, hardworking, technically competent people.
To apply for this position please forward your CV in PDF or Word format by clicking the apply button.
Related posts:











